Citation

Abstract

The capability for scientists to remotely control systems located at the Deep Space Network facilities only recently has been incorporated in the design and implementation of new equipment. However, time lines for the implementation, distribution, and operational readiness of such systems can extend much farther into the future than the users can wait. The Radio Science Systems Group was faced with just that circumstance; new hardware was not scheduled to become operational for several years, but the increasing number of experiments and configurations for Cassini, Galileo, Mars missions, and other flight projects made that time frame impractical because of the associated increasing risk of not acquiring critical data. Therefore, a method of interfacing with the current radio science subsystem has been developed and used with a high degree of success, although with occasional problems due to this capability not having been originally designed into the system. This article discusses both the method and the problems involved in integrating this new (remote) method of control with a legacy system.

Keywords

radio science data acquisition remote operations unattended operations operations signal processing real-time configuration

Details

Volume
42-134
Published
August 15, 1998
Pages
1–10
File Size
143.9 KB