Citation
Abstract
The last major upgrade to the DSN Monitor and Control System was during preparation for support of the Mariner Mars 1971 (MM’71) mission. Since then, several improvements have been made, specifically: incremental improvements in the DSS Monitor and Control Subsystem, implementation by the Block I Network Control System (NCS) Project of the network operations control functions, and implementation by the Block II NCS Project of the design of the Network Control Monitor and Control Subsystem. These changes are described in this article.
Details
- Volume
- 42-21
- Published
- June 15, 1974
- Pages
- 5–7
- File Size
- 267.5 KB