Citation

Abstract

A method is given for determining deep space station operational availability as a function of the reliability of replaceable subassemblies and the time required to replace them when they fail. It is shown that a reduction in replacement time can have a significant effect on station operational availability.

Details

Volume
42-21
Published
June 15, 1974
Pages
55–58
File Size
297.4 KB