Citation

Abstract

A model of the tracking constraints, maintenance constraints, labor constraints, and labor costs of a DSN complex is made. The problem of minimizing the labor cost while satisfying the constraints is solved. Minimum cost schedules for all cases of interest are given. Modifications of the model are suggested.

Details

Volume
42-21
Published
June 15, 1974
Pages
119–136
File Size
1.3 MB