Citation

Abstract

The Network Control System (NCS) software implementation for Block I and Block II involves two distinct multicomputer systems. NCS Block I is a threecomputer system; NCS Block II is a five-computer system. While completely separate, these two systems will operationally complement each other to provide required NCS operational support until NCS Block LI is implemented. Both systems are presently designed and coded and are under NCS testing. NCS Block I will be available for operational testing July 1, 1974. This will not include the capabilities for sequence of events generation, and tracking predicts generation. Both programs are scheduled for operation at a later date. NCS Block II will be available for operational testing in early September 1974.

Details

Volume
42-22
Published
August 15, 1974
Pages
160–169
File Size
648.4 KB