On April 26, 1976, the Network Operations Control Center was declared available for planetary operations in support of the Viking Project. This final capability in the Network configuration for Viking had been delayed since February with hardware and software problems both in the Control Center and at the Deep Space Stations. The effect of these problems, particularly insofar as they affected production of intermediate data records, the resolution of the problems, and the current status of the Network Operations Control Center in the Viking environment, is given in this article. Also discussed are the Operational Verification Tests performed to check out the new capabilities and associated procedures. The Viking Project tests supported by the DSN and finally the DSN support of Viking cruise operations, along with some statistics on performance, are included.