Citation
Abstract
The Quality Assurance DSN and Mechanical Hardware Section and the Fabrication Section have redesigned the wire spindle section of the wire screening test equipment to prevent breakage of small gage magnet wire during testing operations.
Details
- Volume
- 42-36
- Published
- December 15, 1976
- Pages
- 102–104
- File Size
- 1.1 MB