Citation
Abstract
This report covers the period 1 January through 28 February 1977 and includes the initial Viking Extended Mission period of DSN “normal” support, following the nonstandard operations during the Solar Conjunction period. The operational testing subsequent to the MK III Data System installations at DSS 12, 44, and 62 during this period is also discussed.
Details
- Volume
- 42-39
- Published
- June 15, 1977
- Pages
- 4–8
- File Size
- 309.8 KB