Citation
Abstract
This report covers the period from May 1 through June 30, 1977 and includes the initial two weeks of post-MDS Viking related testing at DSS 14. Some of the periodic tests routinely carried out with the Viking Orbiter spacecraft by the spacecraft telecom and DSN teams to ensure optimum performance or detect any degradation in the spacecraft radio or command equipment are also addressed. 1977.
Details
- Volume
- 42-41
- Published
- October 15, 1977
- Pages
- 16–20
- File Size
- 455.1 KB