Citation

Abstract

This report covers the period from May 1 through June 30, 1977 and includes the initial two weeks of post-MDS Viking related testing at DSS 14. Some of the periodic tests routinely carried out with the Viking Orbiter spacecraft by the spacecraft telecom and DSN teams to ensure optimum performance or detect any degradation in the spacecraft radio or command equipment are also addressed. 1977.

Details

Volume
42-41
Published
October 15, 1977
Pages
16–20
File Size
455.1 KB