Citation

Abstract

The Pioneer Venus 1978 Flight Project DSN Telecommunications Compatibility Test Program consists of three phases: Subsystem Design, System Design and System Verification Tests, which are to be performed at JPL and at the U.S. Air Force Eastern Test Range and Kennedy Space Center Complexes. Subsystem Design Tests were performed during April 1977. A subset of System Design Tests were performed during November 1977. This article describes the tests that have been completed through 1977. Deep Space Network — Flight Project Interface Compatibility

Details

Volume
42-45
Published
June 15, 1978
Pages
39–100
File Size
3.5 MB