Citation

Abstract

This article presents the goals and data collection requirements to be used for the economic and performance evaluation indices and life-cycle cost parameters for the upcoming operations demonstration of an automated Deep Space Station run unattended and controlled remotely from JPL. These evaluation indices will compare the remote operation of telemetry at DSS 13 with the cost and performance of a comparable manned operation at DSS 1]. A description is presented of the data that needs to be collected, how the data will be analyzed, and what can and cannot be learned from this operations demonstration.

Details

Volume
42-45
Published
June 15, 1978
Pages
165–171
File Size
515.4 KB