Citation
Abstract
The use of Level 4 Prepass Readiness Tests (“load and go” pre-track preparation) provides an efficient increase in Network productivity. Application of this method of operation was evaluated for Voyager support, so that increased tracking could be provided to all projects during a period of continued interproject conflicts.
Details
- Volume
- 42-45
- Published
- June 15, 1978
- Pages
- 302–305
- File Size
- 176.9 KB