This article summarizes the data base collected for nine weeks of recent operation at DSS 11. Life cycle cost (LCC) parameters on efficiency and productivity ratios, costs, and telemetry were calculated from this data base. The data base and LCC parameters will be used as part of the economic and performance evaluation of the operations demonstration of running DSS 13 unattended and remotely controlled from JPL. The results will enable a comparison to be made between the remote operation of telemetry at DSS 13 with the cost and performance of a comparable manned operation at DSS 11.