Citation
Abstract
When three of the six pressure-surge chambers in the Goldstone Water Supply Distribution System became inoperative, a study was undertaken to determine whether the surge chambers are a necessarily integral part of the system to safeguard against water hammering. An alternate cost effective method of safeguarding against this phenomenon was found, and is expected to be implemented in the system by the end of Calendar Year 1980.
Details
- Volume
- 42-59
- Published
- October 15, 1980
- Pages
- 134–141
- File Size
- 496.3 KB