Citation

Abstract

Beginning with the Galileo spacecraft launch in 1985, deep space payloads will be launched via the Space Shuttle. This change from the previous use of expendable launch vehicles will introduce large changes in procedures and data flow configurations for both the flight project and the Deep Space Network during the launch period. This article describes a typical Galileo launch period sequence of events and telemetry and command data flow configurations.

Details

Volume
42-70
Published
August 15, 1982
Pages
21–36
File Size
763.1 KB