Citation
Abstract
An operator workload measurement methodology is presented which will be used in support of the Mark IVA Operational Test and Evaluation (OT&E) Plan. Three operator workload measures are suggested: operator ratings, primary task work measures, and information processing time measures. A method of validating the workload measures using secondary task work measures is presented, We can expect that operations testing using these measures will assist in establishing the time required to perform essential operational activities and will indicate high risk operations areas due to potential operator overload.
Details
- Volume
- 42-72
- Published
- February 15, 1983
- Pages
- 177–185
- File Size
- 826.1 KB