Citation
Abstract
This article presents results of station frequency stability testing performed at DSS 13 during May 1985 through March 1986. The testing was done on X-band uplink and Xand S-band downlink subsystems as well as on end-to-end systems. The subsystem test data are useful for assessing the frequency stability of various prototype X-band uplink or downlink subsystems for purposes of making design improvements. Information derived from extensive testing at DSS 13 will be useful in the preparation of an X-band Uplink Demonstration Experiment to be conducted at DSS 13, and will also be valuable in the preparations of gravity wave experiments to be conducted at other DSN stations in the future.
Details
- Volume
- 42-86
- Published
- August 15, 1986
- Pages
- 1–14
- File Size
- 983.3 KB