Citation
Abstract
The overall DSN System test plan, as edited for the DSN multi-mission Telemetry System, is briefly described. Specific results, with delivered Mariner Mars 1971 telemetry software, are presented in relation to this test plan. Recommendations are included for future system demonstration, specifically as to system documentation and training.
Details
- Volume
- VI
- Published
- December 15, 1971
- Pages
- 10–12
- File Size
- 265.4 KB