Citation
Abstract
The DSN plans to use the Mark III system configuration for the tracking and data acquisition support for the Pioneer F and G mission. As a continuation of the description of the network systems, the configurations of the simulation, monitoring, and operations control systems are given. Block diagrams show the planned functions, data flow methodology and the interfaces between the subsystems and the three DSN facilities.
Details
- Volume
- VI
- Published
- December 15, 1971
- Pages
- 13–23
- File Size
- 884.3 KB