Citation

Abstract

The existing open-loop receivers at DSS 14 are being modified on an R&D basis to support the Mariner Venus-Mercury 1973 mission. These modifications will provide both S- and X-band phase-stable receivers to obtain occultation data. A description of the modifications is presented in this article.

Details

Volume
XV
Published
June 15, 1973
Pages
51–53
File Size
177.0 KB