Citation
Abstract
The existing open-loop receivers at DSS 14 are being modified on an R&D basis to support the Mariner Venus-Mercury 1973 mission. These modifications will provide both S- and X-band phase-stable receivers to obtain occultation data. A description of the modifications is presented in this article.
Details
- Volume
- XV
- Published
- June 15, 1973
- Pages
- 51–53
- File Size
- 177.0 KB