Citation
Abstract
The transfer of the Digital Instrumentation Subsystem from the Spacecraft Compatibility Station in Cape Kennedy to Deep Space Station 61/63 in the Madrid Deep Space Communication Complex necessitated the fabrication of a new system to utilize as a controller for the Compatibility Test System. An automatic data processing equipment acquisition plan for category B equipment was submitted in July 1972 for this purpose. Implementation of the new Compatibility Test System hardware and a discussion of the functional design considerations is presented. (7)
Details
- Volume
- XVI
- Published
- August 15, 1973
- Pages
- 5–7
- File Size
- 229.8 KB